Saturday, June 19, 2010
1019 hrs - Too much write about and too little time at the moment. We must catch the slack at Seymour Narrows on our way to Blind Channel this afternoon. Other neighboring vessels are casting off with the same intentions so we are soon to follow suit. Much data and reconnaissance collected to navigate safely northward. We made customs clearance on our first day. Bedwell reached by 1900 hrs from Bainbridge departure at 0730. The following day saw a 2100 hrs arrival at Deep Bay near Denman Island in the Georgia Strait - a welcome safe harbour from the SW blow on the Strait. And now we depart Campbell with full water and 3/4 fuel and provisions to take our time meandering through the eastern reaches of Johnstone Strait. Winds and tides are always on our mind. Short passages are the rule. Hope to Blog with more leisure soon.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment